Agbot
T2 5 SERIES
Built for high-capacity work on broad arable land, the AgBot T2 5 SERIES combines powerful diesel-electric drive with soil-preserving crawler tracks for precision and performance.
Integrated with TraXwise and fully smart-enabled, it turns every task from seeding to cultivation into a hands-free, reliable process.

Performance
The proven all-rounder and ready for hours of high-capacity work on broad arable land.

Low impact
Soil preserving crawler tracks adjustable track width from 1.90m up to 3.20m.

Freedom
Autonomous operation pre-planned and monitored through TraXwise, freeing up time and labour.
TECHNOLOGICAL AGXCELLENCE
- Standard control valves
- Safety mechanisms
- Lidar detection
- Front and rear cameras
- Standardized 3-point linkage
- App control
- Data-gathering
- Standard Isobus /TIM
ONE MACHINE, MANY JOBS
Flail mowing
- Implement: 3m PTO-driven flail mower
- Speed: 7 km/h
- Fuel: 13 l/h
- Crop: winter cover crop
- Topography: flat
Subsoiling
- Implement: 4m spring tine cultivator
- Speed: 2 -5 km/h
- Fuel: 13 l/h
Soil cultivation
- Implement: 4m seedbed combination
- Speed: 7 km/h
- Fuel: 19 - 23 l/h
- Soil: sandy, heavy clay
- Topography: flat
FAQ's
Where can I see the AgBots in person?
Please check out our Find a dealer page. Our partners are happy to organize a demo or visit to one of our current customers.
What implements can I use with AgBots?
Standard implements with a 3-point linkage can be used in the field with an AgBot. Applications which the machines can perform differ from soil- and seedbed preparation, stubble tillage or weeding to (flail) mowing or grassland maintenance. Furthermore, our W3
How can AgBots be utilized maximally?
During peak times the AgBot can perform repetitive jobs and help get the work done if the timeframe is short. At 75% engine load, the AgBot can work for 20 hours. With good planning and sufficient deployment capacity the AgBot
How long in advance can I plan tasks for the AgBots?
Setting up tasks does not require long and can be performed prior to performing the task. However, it is also possible to plan the task way before the work must be done and save it for later. Planned tasks can